Overview

Powerlink was engaged by Edify Energy to connect Whitsunday and Hamilton Solar Farms to the existing transmission network near Collinsville. Powerlink constructed a new 132kV transmission line and substation for the two connections, and an additional feeder bay at our existing Strathmore Substation.

Status

Powerlink works were completed in 2018.

Details

Northern

Transmission Lines

Construction

Renewables

Completed