Overview

Powerlink was engaged to connect Moura Solar Farm to the existing Moura Substation. The 110MW project is located south-west of the township of Banana and is generates energy to power more than 43,000 homes. The project involved building a new feeder bay at the Moura Substation and associated connection works.

Status

Construction works for the connection project, along with energisation of the customer facility, occurred during 2022.

Details

Central

Construction

Renewables

Completed