Overview

Powerlink was engaged by Santos GLNG to establish direct high voltage transmission network connections to supply power to gas processing facilities in the area west of Wandoan and east of Injune.

Works included:

  • construction of the Blythdale, Fairview and Fairview South substations to supply gas compressor stations at Santos GLNG’s Roma and Fairview gas fields
  • building two transmission lines - a 132/275kV transmission line from Eurombah Substation to Fairview South Substation, and a 132kV transmission line continuing north to Fairview Substation
  • construction of a 275kV transmission line connecting Yuleba North Substation and Blythdale Substation.

Status

Project activities commenced in mid-2012. Construction started progressively for the new transmission line sections and substations in 2014, with all works completed during 2015.