Powerlink was engaged by Edify Energy to connect Whitsunday and Hamilton Solar Farms to the existing transmission network near Collinsville. Powerlink constructed a new 132kV transmission line and substation for the two connections, and an additional feeder bay at our existing Strathmore Substation.
Powerlink works were completed in 2018.